Arial picture of the Goreway co generating station  

Blastech processed 8000 tons of steel required to build this facility in the Brantford Plant 1 over a period of 6 months. The coating specification called for  abrasive blast clean to SSPC SP 10 Near White Metal followed by 3 mils of organic zinc rich epoxy.
Blastech Transportation utilized special customized drop deck trailers and coordinated with the onsite contractor to achieve  a smooth work flow for the construction crews.

 

 

  Picture of Ferrero’s first North American  facility

Picture of Ferrero’s first North American  facility during recent construction . Blastech was proud to be associated with the large one million sq ft plant. This internationally known company has now commenced production of its famous chocolate confectionary .
The structural steel was prepared by abrasive blasting to SSPC SP 10 specification and coated with a white high build epoxy.
The Blastech Transportation group was responsible for the safe transportation of the finish coated structural sections to the job site..


  Jet Fuel

We have been awarded a number of contracts related to the jet fuel storage tanks  and the fuel delivery system involving several kilometers of steel pipe for Pearson International Airport and Dorval International Airport .  All the pipe was coated in our Brantford facility .To meet the owners stringent specifications to ensure required life cycle durability, all surfaces were prepared with a mineral abrasive before applying a 100% solids high build epoxy pipe coating to the exterior surfaces. Depending on specification pipe interiors were coated with a approved jet fuel resistant epoxy or special preservative.

Prior to erection the jet fuel holding tanks  were abrasive blasted and the exteriors primed with a zinc rich epoxy primer .Interior surfaces were treated with the Blastech REDI-PLATEtm process.

Blastech Transportation was responsible for the safe transportation of the pipe and rolled tank sections to the several job sites during the course of the contracts

 